Introduction:Analyze the comprehensive energy efficiency of the Foshan Qiqi area, including its typical building and energy supply structure; determine the planning and technical solutions of the energy station, and discuss the feasibility of the construction of the energy flow management center, feasibility study of solar energy utilization and electric pile planning, etc. And planning the cost and financial feasibility of the technical scheme.
Final report of the project:
Project Final Report - Launch Area:
Final report presentation of the project:


Introduction: For the sub-metering energy consumption data of large public buildings, mining the physical information implied in a large amount of data, and discovering the energy waste points existing in the whole building level and energy system level, and the sub-metering data and energy saving amount. The combination of audits finally gives a set of energy savings calculation and auditing schemes applied to the sub-metering platform.
Project Report:
Introduction: The fundamental task of this project is to establish a demand side response to commercial buildings in Shanghai and even the whole country through the successful implementation of demand side response control of a group of buildings under the public building sub-metering platform in Changning District, Shanghai. Successful case of application.
Project results report:
Actual implementation report of demand response in a single building: